11 YEARS ANNIVERSARY

rgb72

POWER ON SCREEN

  • Process 1 Investigate

    Learn, identify, and gather a complete assessment of the project needs, customer requirements and formulate the next stage of development.

    • Brand Immersion
    • Market Immersion
    • Competitive Benchmarking
    • Identify Key Business Objectives
    • Identify Merchandising, Marketing, and Sales Goals
    • Identify Customer Use Cases
    • Set Project Scope
    • Plan Marketing Initiatives
    Deliverables:
    • Primary Research Findings Document
    • Competitive Analysis
    • Strategic Brief
    • Creative Brief
  • Process 2 Architecture

    Work together with client to develop a final of functional and technical requirement.

    Technology and Infrastructure Planning Initial Functional Specification Development Develop Navigation Hierarchy and User Flow Develop Page Schematics

    Deliverables:
    • Flowchart
    • Sitemap
    • Wireframe
    • Required Functional / Content Elements
  • Process 3 Concept

    Once all information, functional, and technical has been determined, it's time to develop strategy for the implementation. The concept design and technical specification will be create as a guide to final production phase.

    • Create New Fresh Design
    • Develop User Experience Design
    • Present Multiple Design Directions
    • Research for the Latest Technology
    • Iterative Design Reviews Based on Client Needs
    Deliverables:
    • Creative Concept Design
    • Prototype
    • Style Guide
    • Technical Specifications Document
    • Recommendations
  • Process 4 Assemble

    Building an actual website starts here. After collecting final information, the website is now build based on final design and technical specification.

    • Develop Selected Design
    • Develop page code, style sheets, and page templates
    • Create Flash Animation Based Upon Design
    • Perform Image Optimization and Art Production
    • Develop Applications, Modules, and Databases
    • Database Configuration
    • Integration of Front-end with Back-end
    • Build Test Models
    Deliverables:
    • Test Models
    • System and User Manual Document
    • User Training
    • User Acceptance Test
  • Process 5 Quality Assurance

    Quality Assurance Testing is a must. At soft launch stage, the website will perform 90% close to the live website. The phase is for final development and correction. Site Launched to a Pre-Staging Environment

    • Verify Content
    • Verify Design
    • Verify Brand Guideline and Corporate Identity
    • Verify System Performance and Capacity Model
    • Verify Functionality
    • Quality Assurance (cross-browser, cross-platform)
    • Legal and Client Acceptance
    Deliverables:

    Pre-launch Website (Soft Launch)

  • Process 6 Launch

    The website is now ready to go public.

    • Site Launched to a Staging Environment
    • Asset Delivery
    • Site Launched Live
    Deliverables:

    Live Website

  • Process 7 Maintenance

    Collecting data such as number of visitors, optimize the web for search engine, online marketing is ready to be in action.

    • Website Analysis
    • Search Engine Optimization
    • Traffic and Site Activity Analysis
    • Fine-tune to sync with marketing initiatives
    • Website Maintenance
    • Media Planning
    • Email Marketing and Analysis
    • Viral Mail
    • Mobile phone Marketing (SMS   Bluetooth)
    Deliverables:

    Future Recommendations